Projects
Current & Past Projects
A look at the transmission, distribution, and substation work Fox Line and its leadership have delivered across the country.
Selected Work
Projects
Select projects that show our track record.
Trico Electric Cooperative — Overhead Joint-Use Make-Ready
Self-performed overhead make-ready across Trico’s distribution system, clearing poles for new fiber/communications attachment under a federally standardized RUS Form 830 contract.
- Client / OwnerTrico Electric Cooperative, Inc.
- LocationSouthern Arizona (Tucson-area service territory)
- Voltage ClassDistribution — 14.4/24.9 kV
- ScopePole replacements and overhead make-ready — framing/setting, transfers, retirements, and pole-top modifications
- ContractRUS Form 830 unit-price construction agreement (2026)
- ScaleMore than 100 poles across 20+ work orders
- Member-Owners Served53,000 across Trico’s rural service territory
- TimeframeBegan 2025, continuing through 2027
- SafetyZero recordable incidents
Fox Line Construction is self-performing a high-volume overhead make-ready program for Trico Electric Cooperative, preparing the cooperative’s 14.4/24.9 kV distribution system, which serves 53,000 member-owners, for new communications attachments under a RUS Form 830 unit-price construction contract. Work is released by the cooperative work order by work order against owner-provided staking; across more than 100 poles to date, Fox Line’s IBEW union crews have performed full pole replacements (upgrading classes such as 45-4 to 50-H2 and 40-4 to 50-2), framing and setting, energized transfers, underground riser and UK-5 installations, and a range of pole-top modifications — crossarm raises, neutral clevis and anchor work, a GOAB switch, fiber-arm attachments, and LED street-light installs. As a licensed Arizona contractor (ROC #362640), Fox Line sequences and tracks progress pole-by-pole against utility milestones to keep work moving and customers in service — delivered with zero recordable incidents. Construction began in 2025 and continues through 2027.